The pile of guys, anchor, guy rings, and elevator handcrank. |
|
AB-577 base and 40' of mast waiting to be setup. |
|
Installed screw in guy anchor and self lengthening guys ready to begin. |
|
Base setup and ready to start elevating mast sections. |
|
Installing 4 ele 6M yagi and rope/pully system for 160M Inv Vee. |
|
Finshed 40 ft mast guyed at 3 levels, topped with 4 ele 6M yagi and 160M Inv L to the right. |
|
Just finished installing the AB-577 heavy duty mast, at sunset. |
color coded guys based on final length. |
|
What the finished guys look like. red top, blue middle, white bottom. |
|
|
|
|
|
|